image.png image.png  image.png

奥马资料大全1133

News classification

Product classification

Contact us

企业名称:

联系人:

电话:

手机:

邮箱:

传真:

地址:

Several methods of decoration of imitation stone paint brands

Date of release:2018-06-08 Author:东艺宝小编 Click:

    

    Paint is the face project in household decoration, to a large extent, determines the internal texture of the house. The construction method of coating is an important factor that affects the quality of coating construction. Today, the east art treasure imitates the stone lacquer brand small make up to popularize to everybody the common several kinds of coating decorates a method.


    Brush painting is the method of using brush for construction. Brush coating is a kind of quality assurance method in coating construction, and can save coating. The disadvantage is that the proficiency of the workers is high and the efficiency is low.

仿石漆品牌

    

    The method of wall construction by roller is adopted. It is suitable for large area construction with high efficiency and low requirement for workers. But this kind of construction method is more expensive material, the surface will appear hemp shape fish skin effect, influence beautiful.


    High pressure airless spraying, using special tools, high pressure through the hose to the spray gun, spray to the wall, forming a smooth and dense layer. High efficiency, more professional, but low paint concentration.


    To ensure that the substrate completely dry before painting, coating of ability in the construction of temperature control in 5 ℃ above, in the process of dry film, when the temperature is lower than 0 ℃ emulsion will seas demulsification, loss of adhesion and film forming function, we must ensure that film cannot be lower than 0 ℃ low temperature in the process of drying. When the environment temperature is lower than 5 ℃ construction, as far as possible choose to have the sun wall construction, the construction of time every day should be controlled between 9:30 in the morning and afternoon at 3:30, shadow wall construction should choose in the morning and afternoon at 2:30 this period of time for the construction of high temperature. When the environment temperature is less than 5 ℃, the temperature is lower than 0 ℃ at night and not below 5 ℃, one-component oily optional acrylic primer and oily acrylic paint, due to temperature oil paint will dry slowly in the process of film forming, so 24 hours after the will to carry on the construction of next working procedure.


    Flat coating process: clean up the surface to fill the cracks, local blow be bored with child, smooth - the first is full blow be bored with child - smooth - the second is full blow be bored with child - smooth to besmear brushs cementing primer, spreading for the first time finish - the second time finish - to meet the requirements.


    The next construction can only be carried out after the last latex paint film is dry through, and the last paint film should be cleaned before painting. Paint dry hardening is through the evaporation of water of physical process, therefore, higher humidity of the air or the low temperature will delay the time of paint drying hardening at 25 ℃, relative humidity 50% cases, accordance with the time for 2 to 3 hours.


The address of this article:/en/news/405.html

Key word:仿石漆品牌,水漆品牌,水漆加盟

Recently browse:

东艺宝-PC端------首页_10.jpg  东艺宝-PC端------首页_12.jpg

TEL:400-8989-002            E-mail:[email protected]